Monthly Archives: December 2007


ISPE update and plan

Extraction technology: We successfully tested the keystone extraction system in October, using a stainless steel arm. It was clear, however, that a vibration isolation table is required in the Cosmic Dust Lab. The table was ordered in October, and just arrived at JSC on Dec. 5. Mike Zolensky, Ron Bastien […]


New Updates to the Website

During our down time we implemented some new updates on the website that we have been testing over the past several weeks. First, we altered the way events in the My Events page are loaded, and that page should now load much faster. Please check it out and let us […]


Downtime!!!

We are going to have about 24 hours of downtime starting on Thursday December 6th, 2007 3 pm PST until Decemeber 7th at 3 pm. The entire Space Sciences Laboratory will be dark, without power, for about 12 hours. We’ll be doing some software updates during the non dark time. Thanks,Stardust Admin